Mixed-use development, Galle
14 floors of retail, office and residential on a constrained coastal site with a high water table.
2 months ahead of programme
- Structural
- Site management
Civil engineer, C.Eng
Twelve years of structures that came in on time and stayed standing.
Chartered civil engineer with twelve years on commercial, residential and highway projects, most recently as site lead on a LKR 2.8bn mixed-use development.
I have spent enough time on sites to know that the drawings and the ground rarely agree, and that the difference is managed by people, not software.
Mixed-use development, Galle · 2021 — present
Highway contractor, Southern Province · 2016 — 2021
14 floors of retail, office and residential on a constrained coastal site with a high water table.
2 months ahead of programme
22km of drainage, culverts and embankment protection delivered through two monsoon seasons.
LKR 310m package
Value engineering exercise replacing bored piles with driven piles after revised ground investigation.
LKR 94m saved